Research of Quasi-static Calibrating Technology for Blast Pressure Sensor 爆破压力传感器准静态校准装置应用研究
Considering the actual characteristics of gas-fired boiler, a boiler pressure control strategy based on feedforward signal of blast furnace gas main pipe pressure is presented in the paper. 针对燃气锅炉的特点,提出了一种基于高炉煤气总管压力前馈信号的燃气锅炉炉膛负压控制方案。
Sometimes the melted rock comes out with a great blast of pressure. 有时熔岩会迸发而出,产生巨大的爆破压力。
A Data Analysis Software of Data Acquisition system and Its Use in Blast Pressure of FAE 数据采集系统软件设计及其应用研究
A tremendous explosion occurred at the Commissioner's building. Sometimes the melted rock comes out with a great blast of pressure. 在专员办公楼前发生了一起大的爆炸事件。有时熔岩会迸发而出,产生巨大的爆破压力。
Can also be used for military industry, such as using it to measure the bullet in the chamber guns firing moment of the change of the bore pressure and the muzzle blast pressure. 也可以用于军事工业,例如用它来测量枪炮子弹在膛中击发的一瞬间的膛压的变化和炮口的冲击波压力。
Secondly, under the same air quantity, the blast velocity and blast momentum with considering the pressure loss of blast system are higher than those without the pressure loss of blast system. ②在风量相同的条件下,考虑送风系统阻力损失的风速和鼓风动能值较不计送风系统阻力损失时要高;
Blast Furnace Gas Pipes Pressure Plugging Technology 高炉DN1400煤气管道带压堵漏技术的应用
Optimizing Purification Process to Stabilize Blast Furnace Top Pressure and to Achieve TRT Generating Capacity 优化净化工艺确保高炉顶压稳定及TRT发电达产
TRT Device on the Influence of Blast Furnace Top Pressure and Control TRT装置对高炉炉顶压力的影响和控制
Blast furnace ever recovered the whole blast pressure operation within 32 minutes after blowing-down for 108 minutes, but a stabilizing smoothing of BF operation is ensured. 高炉曾经短期休风108min后,在33min之内恢复全风作业,而炉况稳定顺行。
The Static Pressure Regain Blast Pipe Equalizing Static Pressure is Applied in Blowout Wind System of Electronic Computer 静压复得等静压送风管在电子计算机通风系统中的应用
In addition, the influence of the street junctions on blast wave impulses and pressure produced by vehicle bombs are considered. 针对汽车炸弹在城市中爆炸的复杂环境,分析爆炸冲击波在街道交叉口的传播规律及街道交叉口对冲击波压力和冲量的影响。
The seismic effect on the neighboring workshops exerted by the blast in pressure tunnel 某压力隧洞爆破对附近厂房的地震效应研究
The establishment of measuring method of FAE weapon blast pressure field will provide uniform technical measures and standard data for the preliminary study, design finalize, power comparison of FAE weapon. FAE武器爆炸状态场压力场测试方法的建立将为FAE武器的预先研究、设计定型、威力对比等提供统一技术措施和规范化数据。
On the basis of it, a design and calculated method of this bursting discs is summarized and given, which is verified in engineering application and reaches blast pressure precision of Country standard. 在此基础上,总结提出了该爆破片在工程上既实用且经工程考核其爆破压力精度又能满足国家标准要求的设计计算方法。
An introduction was made on structure and function of the control system controlling furnace top pressure of No. 4 blast furnace after top pressure recovery turbine ( TRT) was used in Panzhihua Iron Steel Company. 介绍了攀钢4高炉实施余压发电后的炉顶压力控制系统结构与功能。
Development of blast furnace top pressure recovery turbine ( trt) in Japan 日本高炉炉顶压回收透平技术的发展
We established the control and experimental system for research and test of TRT top pressure stability and solve the problem of the blast furnace top pressure successfully. 同时首创性地设计和建造了TRT装置模拟试验台,并制定了TRT装置顶压稳定性问题的实验方案;
Application of Blast Shock Pressure for the Manufacture of Die Casting 冲击压力在压铸件生产中的应用
Recovery of CO from Blast Furnace Gases by Pressure Swing Adsorption 变压吸附法回收高炉气中CO的研究
After that, the blast supper pressure, harmful gases and temperature in the tank were measured. The degree of animals injuries was inspected. 另用反坦克地雷,在坦克履带下引爆,同时测试坦克内冲击波超压、有害气体及温度,试验后检查动物伤情。
The ascensional velocity of maximum blast pressure of mixture will rise due to the existence of gas, but maximum blast pressure is almost unchangeable. 混合物的最大爆炸压力上升速度由于瓦斯的存在而增强,而最大爆炸压力几乎没有变化。
Meanwhile, as TRT is popularized, customers often worry about instability of the blast furnace top pressure caused by TRT unit and the influence on the product when TRT unit is applied for power generation. 但由于TRT装置的高炉顶压的稳定性是影响主流程高炉生产工艺的重要因素,因此如何解决安装TRT装置后的高炉顶压稳定性问题对于TRT技术的质量和推广是很关键的。
As an efficient secondary energy recovery system, Blast Furnace Top Gas Pressure Recovery Turbine system ( TRT) works on the premise that ensuring the stability of blast furnace top pressure. 高炉炉顶煤气余压回收透平发电装置(TRT)作为一种高效的二次能源回收装置,其运行的前提是必须确保高炉顶压的稳定性。
The system makes underwater blast pressure sensor 、 circuit module and power supply together, and put down in solid steel shell, which makes up of the underwater shock wave measurement system working independently, and can lay in underwater. 该系统将压力传感器、电路模块及电源紧凑封装在坚固的钢壳内,组成一种可相对独立工作放置于水下被测点的便携式水下冲击波超压测试仪。
To overcome the considerable fluctuation, strong coupling and nonlinearity of the blast furnace, Fuzzy Algorithm is used to improve the original PID controller, and the hybrid control method based on fuzzy-PID is proposed in this paper to design the blast furnace top pressure control system. 本文针对华菱涟源钢铁公司2200m3高炉顶压波动大、强耦合、严重非线性的问题,利用模糊算法,对原有的PID控制器进行改进,设计了基于模糊PID混合控制算法的高炉炉顶压力控制系统。
In order to blast to pressure relief, potential dangerous zone is forecasted and parameters of blast to pressure relief are determined using elastic strain energy density method. 在卸压爆破方面,首先应用弹性应变能密度法预测冲击地压区域和确定卸压爆破参数。
This paper applied fault diagnosis technology to achieve the protection to the unit, avoids unnecessary parking which caused by the blast furnace top pressure increases instantaneous. It provides strong support to ensure long-term safe and stable, smooth running and increase economic benefits to TRT. 本文应用故障诊断技术实现了对机组的保护,避免了因高炉顶压瞬间增大而导致的不必要停车,为保证高炉TRT长期安全、稳定、顺行以及提高经济效益等提供了有力支持。
With the blast velocity increasing, the pressure in the furnace increases. 随风口鼓风速度的增加,炉内压强值增加。